How long it takes to build a pool in Florida? On average, it takes around 12-16 weeks to build a pool, or sometimes even a couple of months. The time required to build a swimming pool varies depending on factors such as design complexity, pool size and type, materials, weather conditions, permit approval time, and other relevant considerations.
Owning a personal pool in your backyard means exciting weekends, unlimited summertime fun, and quality time with your loved ones. No crowds, waiting, and trips to public pools! Plunge into the pool whenever you are in the mood.
So, the idea of building a pool in your yard is truly exciting. But how long does it take to build a pool, from start to finish? That’s what we are going to answer her.
Keep reading to discover the timeline for pool installation:
Stage | Expected Duration |
---|---|
Pool design | 1 to 4 Weeks |
Permit approval | 2 to 6 Weeks |
Excavation | 1 Week |
Steel, plumbing, and electrical | 1 to 2 Weeks |
Gunite, plastering, vinyl, fiberglass | 1 to 3 Weeks |
Landscaping, hardscaping and custom features | 1 to 4 Weeks |
Here are the key factors that can help or hinder your pool construction timeline. Learning about these factors can be beneficial at various stages of pool design and construction. So, let’s explore:
The pool size and project affect the timeline. Naturally, larger pools with more intricate landscaping and hardscaping around them require more time than smaller pools.
Homeowners often want to add decks, fire features, spas, outdoor living areas, and more to their pool, which greatly increases the yard’s appearance and the project’s cost and duration of completion.
In-ground pools take longer—about 12-16 weeks—due to the excavation and substantial groundwork required. In contrast, aboveground pools can be built in as little as 2-5 days.
It’s often challenging to determine how long it will take to obtain pool permits. As per your location and the project’s complexity, this could take 2-6 weeks. Some projects may undergo multiple approval levels, while others may have simpler processes.
Note: Start searching for your pool contractor and start the permit process before spring to save time.
The material—vinyl, fibreglass, and concrete—you choose for your pool is another critical factor that influences the timeline of pool installation.
Concrete or gunite pools take the longest time to build due to labour-intensive processes such as excavation, rebar installation, plumbing, curing, and finishing. Whereas, fibreglass pools can be installed within a couple of weeks because the shell is pre-made. Vinyl pools take less time than concrete pools but longer than fibreglass because they require assembling a frame and installing the liner.
Unfavourable weather conditions, such as extreme rain, bitter cold, or intense heat, might cause work to stop and prolong the time needed to build a pool.
One of the first and most important tasks in the entire process is excavation. But rain can make it challenging. Excavators find it difficult to get to the work site when the ground is damp from rain. The soil turns too soft and unstable, making it nearly impossible to excavate the pool’s shape due to the ground’s tendency to collapse.
Additionally, when the soil is wet, the pool walls may collapse, necessitating further excavation by the builders. Builders must wait for the water to dry up and use a pump to remove any extra water if it rains after excavation.
Intense heat or cold can also derail your pool project for days or even weeks due to difficulty working.
Other factors like soil conditions, availability of the desired contractor, material delays, and unexpected construction issues also affect the timeline of your pool’s installation.
For several reasons, it may be wise to build a pool during the off-season. There is a huge potential for large cost savings.
Building a pool in the off-season has the added benefit of a quicker construction schedule. Pool builders can devote more time and resources to your pool, guaranteeing a speedier completion, if they have fewer jobs on their calendar. This ensures that your pool will be operational by spring, allowing you to enjoy it all summer long.
Spring is a good time to install a pool. But pool contractors are often busy during this period to meet demand. During summer, the warm and dry ground helps speed up the building process. But given that summer is the most popular season to build pools, expect higher costs, and heatwaves can delay the work as labor and contractors need more breaks.
What is the best season to build swimming pools? Fall is the best season to build your pool. It’s because most contractors are available, weather conditions are favorable, and you can get your personal pool built at relatively lower prices.
You can trust Epic Watershapes for custom pool designs that make your backyard the envy of the neirgborhood. We guarantee a beautiful and reasonably priced swimming pool, built to create lasting memories for decades to come. Rest assured about the timeline! Punctuality is one of our core values. We ensure your pool is ready before the agreed-upon time.
So, why wait anymore? Reach us for a quick, free quote today.