Parkland Pool Design, Construction & Renovation
Gunite pools designed, permitted and built by one team — from Parkland Golf & Country Club and Heron Bay. Free 3D design before anything is dug.
Tell us about your property and we’ll follow up with a free 3D design and financing options. No pressure, no generic pricing sheet.
The cost of waiting
A hairline crack in a gunite shell does not stay hairline. Water finds it, the steel behind it starts to rust, and what would have been a resurface becomes a structural repair plus a resurface.
Waterline tile that has started to release takes the coping with it when it finally goes. A filter and heater running a decade past their rated life do not fail politely — they fail in July, and they take the finish with them when the chemistry goes out.
What we do
One team from the first 3D rendering through permitting, construction and the final walkthrough.
New BuildEngineered gunite shell, interior finish, waterline tile, filtration and heating-ready equipment, paver or broom-finish deck. Permitting, engineering and inspections handled by us. 8–12 weeks of construction after approvals.
Pool & spa construction →
RemodelReshaping, sun shelves and spas added to existing shells, deck replacement, tile and coping, full equipment and automation modernisation. Structural repairs are done before any finish work — never over the top of them.
Pool & spa remodeling →
ResurfaceQuartz finishes with a 10-year warranty, and the PebbleTec range — better technology, better longevity and a lifetime warranty. We will tell you honestly which tier your pool and your plans justify.
Pool & spa resurfacing →Looking for a fixed scope? See our pool packages.
Local knowledge
Plans are reviewed and inspected by City of Parkland Building Department. Permits go through the MyGovernmentOnline portal; landscape and tree permits are handled separately by Development Services. What they ask for: a separate city permit is required to remove, relocate or replace any tree or palm, which applies to most pool excavations on a mature-canopy lot. The city publishes seven to twenty-one days for landscape and tree permit review; it does not publish a pool review time.
Side-yard width is what decides whether the shell gets trucked in or pumped, and whether the spoil is hauled or carried. That one measurement swings the cost of an identical pool more than size or depth does. We walk the access route before we design anything, and we will tell you on the visit if it is going to be the expensive kind.
The tree permit is the thing that catches people out here: a canopy lot can need the tree approval before the pool permit moves. Drainage is run by the North Springs Improvement District rather than the city alone, so canal and easement work can need district permitting too.
Communities such as Parkland Golf & Country Club, Heron Bay, MiraLago, Cypress Head each run their own committee on their own calendar, and that calendar — not the city — is usually what sets your real start date. We prepare the submittal package and attend the review. Not knowing this is how a project loses a season.
Where we work in this city
Our work
Gunite shells, finishes and decks built by our own crews across South Florida.
Full-length geometric shell with a raised spa, wide travertine surround and a turf-and-paver walkway carried around the whole deck.
Raised spa with sheer descents into the main shell, bubbler sun shelf, and a grid of pavers set into turf running the length of the yard.
Raised wall clad in dark glass mosaic, spilling into the pool. Paver-and-turf deck detailing continued right to the planting line.
The build
Four to twelve weeks of approvals, then eight to twelve weeks of construction.
Site visit, access assessment, and a 3D design you can walk through before anything is approved.
Sealed engineering, City of Parkland Building Department submittal, association or club architectural review where one applies. 4–12 weeks.
Dig, form, steel, plumbing rough-in and the first round of inspections.
Shell shot and cured. The stage nobody can rush without paying for it later.
Waterline tile, coping, decking, then the interior finish last so it is not walked on.
Equipment commissioning, water chemistry, barrier inspection, and how to run it. 8–12 weeks of construction in total.
Most backyard projects are three companies pointing at each other — the builder blames the deck crew, the deck crew blames the plumber. Epic holds the licence, the engineering, the permit and the warranty. If a tile lifts in year two, there is no one for us to blame.
Investment
Real ranges, not a “starting at” number designed to get a foot in the door.
From $60,000
Complete gunite pool
Engineered shell, interior finish, waterline tile, filtration and heating-ready equipment, paver or broom-finish deck. Permitting and inspections included.
$100,000 – $180,000
Most of our projects
Larger or freeform shell, spa, sun shelf with bubblers, upgraded pebble or glass-bead interior, wider travertine deck, LED and automation.
$200,000 +
Resort scale
Multi-level water and fire features, full outdoor living integration, specialty finishes and engineering.
What moves the number most, in order: site access and what is under the ground · size, depth and shape · interior finish tier · a spa and its own equipment · water and fire features · deck material and area · equipment tier and automation · landscape restoration. That is why we survey before we quote instead of quoting off a phone call. See the full cost breakdown →
Testimonials
I was really happy with my experience with the Epic Watershapes team! They built a great pool at my second home in Boca Raton. The whole project, from the initial dig to the final completion, took only 6 weeks! Their excellent communication and project management made the process really easy and quick. The final results look great. I’m especially impressed with Sam’s expertise and professionalism. He worked with us to design a pool that perfectly fits our family’s needs. I highly recommend Epic Watershapes!
Epic Watershapes did an amazing job revamping our backyard in Jupiter. Their team was consistently professional and always quick to respond. Collaborating with their designer was a seamless process, and they crafted a custom pool that suits our family perfectly. The quality of their work is outstanding, with meticulous attention to every detail. They took care of everything, from building the pool to adding water features and even handling the landscaping. We’ve been so impressed that we’ve already suggested them to several of our neighbors!
Everything was absolutely fantastic and great this company is by far one of the best companies ever i would always recommend and refer this company to others. Fantastic work
I love on what y’all do it is awesome and wonderful
125 five-star reviews out of 126 — across Google, Thumbtack and Angi.
Questions
A complete gunite pool starts at $60,000. Most of what we build lands between $100,000 and $180,000 once a spa, an upgraded interior finish and a full deck are in the scope. Access and what is under the ground move that number more than size does, which is why we survey before quoting.
Not a gunite pool, and we would rather say so now than after a site visit. At that number you are looking at a small fiberglass shell with minimal decking, and there are builders who do that work well. We build engineered gunite from $60,000 up.
Eight to twelve weeks of construction, plus four to twelve weeks beforehand for design, engineering, any association approval, and permitting.
Yes. Plans here are reviewed by City of Parkland Building Department, and the barrier inspection has to pass before the pool is filled, not after. We handle the submittal and the inspections.
Routinely. Communities such as Parkland Golf & Country Club, Heron Bay, MiraLago each run their own architectural review on their own calendar. We prepare the submittal package and attend the review.
No. We build gunite, because it lets us shape the pool to the lot instead of shaping the lot to a mould — and on a South Florida lot with limited access, that flexibility is usually the whole project.
It depends on the interior finish. Quartz finishes carry a 10-year warranty. The PebbleTec range carries a lifetime warranty against the finish. Structure and equipment warranties are listed in the contract, not buried in it.
Service area
Next step
72Hours
Book the site visit. We survey the lot, the access and the setbacks, and within 72 hours you have a 3D design of your pool and an itemised price that holds — not a range, not a number over the phone. Free, and yours to keep whether or not you build with us.
Monday – Saturday, 8am to 5pm
No deposit and no obligation to see the design.